Sunday, January 04, 2009
According to Geoffrey de la Cruz, chief of the DPWH’s Bridge Maintenance Section, repairs on the Magallanes flyover will be completed before Monday, January 5, in time for the first working day of 2009. The repairs include the sealing of the cracks on the pavements, leveling the left lane to its previous height and adding support to lessen vibrations on the bridge. Read more about it in this article from Inquirer.net.
Labels: magallanes flyover, repair
Monday, December 01, 2008
Hanggang ngayon, hindi pa din naaayos 'tong kanto ng Santolan at C. Benitez.
Nung Enero pa 'to unang na-report dito sa Huli Ka!, pero hanggang ngayon sira pa din.
May tulo kasi 'ata yung tubo ng Manila Water dito. Naka-ilang beses na sila nag-re-repair dito, pero di pa din maayos. Sana naman magawa na ng mabuti 'to.
Labels: repair
Thursday, January 03, 2008
Sana naman maayos na 'tong kalye dito. Halos lahat ng kotse na pumapasok sa C. Benitez, sinasakop yung kabilang lane para maiwasan yung butas. Nakakaharang tulong sa mga lumalabas papuntang Santolan.
Ang tanong lang ay kaninong responsibilidad ba talaga ito? Nasa border ng San Juan at Quezon City kasi itong kalyeng 'to.
Labels: repair
Thursday, May 18, 2006
Wednesday, May 10, 2006
Tuesday, April 25, 2006
Ditto on this one.
Ginawa pang talyer ng motorsiklo.
First posted here on March 8 of this year.
Wala pa rin hanggang ngayon.
First posted here on February 20 of this year.
Wednesday, April 12, 2006
Until now, nothing has been done to move these concrete road barriers that are currently eating into the northbound third lane on C5. These are the ones located underneath the bridge leading towards Market Market!
This was first posted here last February 20, which is 51 days ago. Sino ba talaga ang dapat mag-asikaso nito?
Tuesday, April 04, 2006
I cannot believe that nothing has been done about this yet.
This was first posted 27 days ago in this entry, but this was actually first sighted around 2 weeks before that. What will it take to get this done?!?
Tuesday, March 14, 2006
This was first posted 6 days ago in this post and it seems that they've already done something about it.
Tinayo nila yung nabagsak na plastic road barrier.
Hay naku!
Wednesday, March 08, 2006
This grill, which is located between the C5-Kalayaan intersection and the bridge over Pasig River, has forever been busted. And for a couple of weeks (or more) now, a plastic road barrier has been placed right before it to let motorists know of the possible danger of falling into the hole.
As much as we appreciate the effort to ensure motorists' safety, we'd rather see them repair the grill.
Wednesday, February 15, 2006
The manhole cover still hasn't been fixed, despite adding to the traffic on this major road caused by the loading and unloading of Don Bosco students and the ever-present-and-always-a-cause-for-headaches jeepneys.
This was first reported here.
Saturday, February 11, 2006
I actually saw that a new cover was already installed last night (Friday, February 10), but I didn't have my camera with me.
The first post on this was January 25, so it took around 26 days to replace the cover from the time it was reported here.







