Wednesday, December 31, 2008

A major traffic jam was formed yesterday on southbound EDSA after one of the lanes on the Magallanes flyover was closed due to the discovery of cracks and holes on the Pasay-bound side of the bridge. Although the cracks were supposedly first discovered by a group of DPWH bridge engineers at 8am during a routine inspection, the lane was only closed at 11am when local policemen noticed the damage. However, Engr. Oscar Cammayo, chief of the DPWH’s 2nd Metro Manila Engineering District, claims that the 40-year old bridge is still structurally sound.

Wonder what kind of inspection they could have done in a few hours to claim that the bridge is still sound? Considering the pounding that the bridge takes everyday and the possibility of earthquakes, wouldn't a more in-depth investigation be called for?

0 comments: